Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Original file line number Diff line number Diff line change
@@ -0,0 +1,22 @@
# PR_26175_CHARLIE_028 Branch Validation

## Startup

- Started after PR #164 and PR #167 were merged.
- Returned to `main`.
- Pulled `origin/main`.
- Verified local `main` commit: `245c30dda9cf`.
- Verified worktree clean.
- Verified local/origin sync: `0/0`.

## Branch

- Branch: `pr/26175-CHARLIE-028-team-charlie-final-closeout`
- Base: `main`
- Scope: final Team Charlie closeout report artifacts only.

## Result

- PASS: branch created from clean synced `main`.
- PASS: no runtime files changed.
- PASS: no UI, API, database, backlog, roadmap, or Project Instruction source files changed.
Original file line number Diff line number Diff line change
@@ -0,0 +1,21 @@
# PR_26175_CHARLIE_028 Manual Validation Notes

## Manual Review

- Confirmed PR #164 is merged.
- Confirmed PR #167 is merged.
- Confirmed `main` was clean and synchronized before PR_028 branch creation.
- Confirmed Team Charlie System Health ownership bullets are present.
- Confirmed Environment Isolation & Developer Experience is Cancelled / Not Doing.
- Confirmed System Health v1 is complete in backlog and roadmap.
- Confirmed future enhancements are separated.
- Confirmed no open Team Charlie PRs existed after PR #167 merged and before PR_028 was opened.
- Confirmed no Team Charlie review requests were found for `ToolboxAid`.
- Confirmed Charlie branch inventory was reviewed.
- Confirmed no Charlie runtime work remains unmerged.

## Scope Check

PR_028 changes are limited to report artifacts under `docs_build/dev/reports/`.

No runtime, UI, API, database, backlog, roadmap, or Project Instruction source files are changed.
Original file line number Diff line number Diff line change
@@ -0,0 +1,32 @@
# PR_26175_CHARLIE_028 Requirement Checklist

- PASS: Review PR #164 final state.
- PASS: Verify PR #164 docs/governance-only scope.
- PASS: Verify PR #164 reports and ZIP artifact.
- PASS: Merge PR #164, or confirm it was already merged.
- PASS: Return to `main` after PR #164 merge.
- PASS: Review PR #167 final state.
- PASS: Verify PR #167 reports-only scope.
- PASS: Verify PR #167 does not change runtime, roadmap, backlog, or Project Instructions.
- PASS: Merge PR #167.
- PASS: Return to clean synced `main` after PR #167 merge.
- PASS: Audit GitHub for open/draft Charlie PRs.
- PASS: Audit Charlie review requests.
- PASS: Audit Charlie branches.
- PASS: Audit backlog.
- PASS: Audit roadmap.
- PASS: Audit Project Instructions.
- PASS: Audit runtime.
- PASS: Verify required reports exist.
- PASS: Create final closeout report.
- PASS: Create validation report.
- PASS: Create branch validation report.
- PASS: Create requirement checklist.
- PASS: Create manual validation notes.
- PASS: Create `codex_review.diff`.
- PASS: Create `codex_changed_files.txt`.
- PASS: Create repo-structured ZIP under `tmp/`.
- PASS: Push PR_028 branch.
- PASS: Open PR_028 draft PR.
- PASS: Do not delete branches.
- PASS: Do not merge PR_028 without separate Owner approval.
Original file line number Diff line number Diff line change
@@ -0,0 +1,54 @@
# PR_26175_CHARLIE_028 Validation Report

## Commands

```text
git status --short --branch
```

Result: PASS. `main` was clean and synchronized before PR_028 branch creation.

```text
git rev-list --left-right --count origin/main...HEAD
```

Result before PR_028 branch creation: `0 0`.

```text
git diff --check
```

Result: PASS.

```text
git diff --name-only
```

Result: PASS. PR_028 changes are limited to `docs_build/dev/reports/`.

```text
rg -n "System Health v1 complete|Cancelled / Not Doing|Environment Isolation|Team Charlie System Health owns" docs_build\dev\ProjectInstructions docs_build\dev\roadmaps
```

Result: PASS. Required backlog, roadmap, and ownership markers are present.

## GitHub Validation

- PASS: PR #164 is merged.
- PASS: PR #167 is merged.
- PASS: no open Team Charlie PRs were found after PR #167 merged and before PR_028 opened.
- PASS: no Team Charlie review requests were found for `ToolboxAid`.

## Runtime Scope

- PASS: PR_028 changed files are reports-only.
- PASS: no runtime files changed.
- PASS: no UI, API, database, backlog, roadmap, or Project Instruction source files changed.

## Playwright

Not run. This is a documentation/report-only closeout PR.

## Unit Tests

Not run. This is a documentation/report-only closeout PR.
Original file line number Diff line number Diff line change
@@ -0,0 +1,117 @@
# PR_26175_CHARLIE_028-team-charlie-final-closeout

## Summary

Final Team Charlie repository closeout after merging PR #164 and PR #167.

This report is documentation/report-only. It does not change runtime, UI, API, database, backlog, roadmap, or Project Instruction source files.

## Completed PRs

| PR | Title | Merge Commit |
| --- | --- | --- |
| #93 | `PR_26172_CHARLIE_001-repository-compliance-audit` | `f2b50ac9d79256df3a7716ac4eff21f3a4303bb3` |
| #94 | `PR_26172_CHARLIE_002-test-results-artifact-cleanup` | `dd72e8396e7b5544bffa54d6730217a8030be457` |
| #151 | `PR_26175_CHARLIE_007-system-health-environment-identity` | `0e25639fb023653bda679290f5748fa0c3a00a8f` |
| #152 | `PR_26175_CHARLIE_008-system-health-current-database-health` | `9701da23450d26d3e1fc00f1fe2653e986e84e55` |
| #153 | `PR_26175_CHARLIE_009-system-health-current-r2-health` | `939c2ab327a2c792c184748d74844914f1b77a90` |
| #155 | `PR_26175_CHARLIE_010-system-health-history-and-closeout + 011-admin-submenu-alphabetical-order` | `d4f4279501abf3d9aaa7f857aa240f6e019b8229` |
| #158 | `PR_26175_CHARLIE_012-024-system-health-completion` | `48d52b1a1f4116fd5c4694e8ec7b1f1e3a3d6e4e` |
| #162 | `PR_26175_CHARLIE_025-system-health-backlog-closeout` | `dbd92d1866c13f62782f54b9b7f7b525cd771514` |
| #164 | `PR_26175_CHARLIE_026-charlie-governance-gap-closeout` | `a66048f50519f4f49b821f69af05d990448c7c74` |
| #167 | `PR_26175_CHARLIE_027-final-charlie-audit` | `245c30dda9cfb6531173c6d9182afe120df8fc9f` |

## Final Repository Status

- Main commit after PR #167 merge: `245c30dda9cf`.
- Main branch verification after PR #167 merge: PASS.
- Worktree before PR_028 branch creation: clean.
- Local/origin sync before PR_028 branch creation: `0/0`.
- Branch deletion: not performed.

## GitHub Audit

- PASS: no open Team Charlie PRs were present after PR #167 merged and before this PR_028 branch was opened.
- PASS: no draft Team Charlie PRs were present after PR #167 merged and before this PR_028 branch was opened.
- PASS: no Team Charlie review requests were found for `ToolboxAid`.
- Note: this PR_028 branch is the final administrative closeout artifact and is not merged by this report.

## Branch Inventory

| Branch | Merged Into Main | Behind Main | Ahead Main | Notes |
| --- | --- | ---: | ---: | --- |
| `origin/pr/26172-CHARLIE-001-repository-compliance-audit` | yes | 214 | 0 | retained |
| `origin/pr/26172-CHARLIE-002-test-results-artifact-cleanup` | yes | 212 | 0 | retained |
| `origin/pr/26175-CHARLIE-007-system-health-environment-identity` | yes | 45 | 0 | retained |
| `origin/pr/26175-CHARLIE-008-system-health-current-database-health` | yes | 42 | 0 | retained |
| `origin/pr/26175-CHARLIE-009-system-health-current-r2-health` | yes | 36 | 0 | retained |
| `origin/pr/26175-CHARLIE-010-system-health-history-and-closeout` | yes | 21 | 0 | retained |
| `origin/pr/26175-CHARLIE-025-system-health-backlog-closeout` | yes | 15 | 0 | retained |
| `origin/pr/26175-CHARLIE-026-charlie-governance-gap-closeout` | yes | 4 | 0 | retained |
| `origin/pr/26175-CHARLIE-027-final-charlie-audit` | yes | 1 | 0 | retained |
| `origin/PR_26172_CHARLIE_repository-compliance-stack` | yes | 94 | 0 | retained |
| `origin/PR_26175_CHARLIE_006-project-instructions-system-health-infrastructure` | no | 81 | 1 | orphaned docs/governance branch; no runtime files |

## Backlog

Completed:
- Repository Compliance
- Test Results Cleanup
- System Health v1
- Backlog Closeout
- Governance Closeout

Active Charlie work:
- None.

Future enhancements only:
- Scheduler execution engine
- Outbound notifications
- External alert delivery
- Provider telemetry
- Charts and metrics
- Log viewer
- Operational automation
- Observability integrations

## Roadmap

- PASS: roadmap matches backlog for System Health v1.
- PASS: System Health v1 is complete.
- PASS: future enhancements are separated.
- PASS: cancelled Environment Isolation and runtime-port work is listed as not active roadmap work.

## Project Instructions

- PASS: Charlie ownership is complete.
- PASS: System Health ownership is present.
- PASS: Environment Isolation is marked Cancelled / Not Doing.

## Runtime

- PASS: no Charlie runtime work remains unmerged.
- The only unmerged Charlie branch is `origin/PR_26175_CHARLIE_006-project-instructions-system-health-infrastructure`.
- That branch is docs/governance/report only and changes no runtime, UI, API, or database files.

## Reports

- PASS: PR_026 reports exist.
- PASS: PR_027 reports exist.
- PASS: PR_028 report set exists in this branch.

## Final Charlie Status

- Current Work: COMPLETE
- System Health: COMPLETE
- Governance: COMPLETE
- Backlog: COMPLETE
- Roadmap: COMPLETE
- Future Enhancements: DEFERRED

## Closeout Note

No branches were deleted. PR_028 is not merged by this report because no separate Owner approval was provided for merging PR_028.

## ZIP Artifact

- `tmp/PR_26175_CHARLIE_028-team-charlie-final-closeout_delta.zip`
11 changes: 6 additions & 5 deletions docs_build/dev/reports/codex_changed_files.txt
Original file line number Diff line number Diff line change
@@ -1,6 +1,7 @@
docs_build/dev/reports/codex_changed_files.txt
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit.md
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-branch-validation.md
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-manual-validation-notes.md
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-requirement-checklist.md
docs_build/dev/reports/PR_26175_CHARLIE_027-final-charlie-audit-validation.md
docs_build/dev/reports/codex_review.diff
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout.md
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-branch-validation.md
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-manual-validation-notes.md
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-requirement-checklist.md
docs_build/dev/reports/PR_26175_CHARLIE_028-team-charlie-final-closeout-validation.md
Binary file modified docs_build/dev/reports/codex_review.diff
Binary file not shown.
Loading