docs: ship itd-94 and close spc-9 behind its fidelity review#143
Open
REPPL wants to merge 1 commit into
Open
Conversation
The intent ready verb has shipped since PR #103; this is the record catch-up the 2026-07-24 queue directs. spec close spc-9 performed the lifecycle transition and parked receipt rcp-20c38dc58b6c; the Role-1 fidelity review returned MET on all six criteria with live command evidence, and the verdict is ingested into the Audit Notes. The impact field is hand-stamped because Reconcile cannot set it — the iss-126 gap, captured on PR #136's branch. Assisted-by: Claude:claude-fable-5
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Ships intent itd-94 and closes spc-9 — the Track 2 record catch-up from the current run queue. No code changes: the
intent readyverb has shipped since PR #103; this PR brings the record up to date with reality, behind the fidelity review the lifecycle owes.Branches from main, independent of the run's open chain.
What happened, in the shipped flow's own order
abcd spec close spc-9performed the transition in one verb: spec open/ → closed/, intent planned/ → shipped/, and a fidelity receipt parked as OWED (rcp-20c38dc58b6c).abcd intent review ingestwrote the verdict into the shipped intent's Audit Notes with full provenance (verifier, rubric/prompt hashes, input attestations).impact: additivefield is hand-stamped in the same commit because the Reconcile path cannot set it — that's the iss-126 gap captured earlier in this run (rides PR fix: let capture resolve and intent seed stamp a valid impact #136's branch); the workaround is recorded, not silent.Notes for the record
record-lintexit 0 andmake preflightexit 0 after all edits;abcd intent ready itd-94exited 0 (planned) before the move as Step 0.