Skip to content

docs: record grill decisions and the 2026-07-24 next-run queue#134

Merged
REPPL merged 1 commit into
mainfrom
docs/grill-decisions-next-run-queue
Jul 24, 2026
Merged

docs: record grill decisions and the 2026-07-24 next-run queue#134
REPPL merged 1 commit into
mainfrom
docs/grill-decisions-next-run-queue

Conversation

@REPPL

@REPPL REPPL commented Jul 24, 2026

Copy link
Copy Markdown
Owner

Records the outcomes of the 2026-07-24 maintainer grill interview that settled every pending design decision, and writes the queue for the next autonomous implementation run.

Decisions recorded (.abcd/work/DECISIONS.md, five entries with rejected alternatives)

  • iss-35 — resolves: the record-lint graduation it stayed open for is shipped and armed (surface_coverage blocker, 16 surface chapters, skills-to-commands relabel, machine-checked staged Status column, release-gate crosscheck). iss-122 carries the only residue.
  • iss-122 — the crosscheck gate gets a committed input manifest with tiered depth (full for feature/breaking, Direction-B shallow for patch); the receipt echoes manifest hash + tier; automated refusal is procedural only — confirmed findings route to the maintainer, whose PROMOTE with recorded dispositions is the gate.
  • itd-93 — all four open questions resolved: launch sub-verb; self-scaffold parity (abcd-cli's own release workflows regenerate from the shipped template); built-in workflow_dispatch rehearsal mode; the changelog dated-heading format is the itd-73 seam. Promotes standalone/minor with a PRD synthesised from the interview.
  • itd-28 — Stage 2 signed off as scanner-seam adapter work: native patterns default, gitleaks the stronger opt-in adapter, engine always reported (loud staging), CI gitleaks the authoritative backstop. No new hard dependency; adr-22 holds.

Files

  • .abcd/work/DECISIONS.md — the five dated entries
  • .abcd/development/plans/2026-07-24-next-run-queue.mdnew: run queue with STOP conditions and three tracks (friction fixes + grill consequences → itd-94 → walk fixes + itd-88); supersedes the 2026-07-18 queue file's pick-up role
  • .abcd/work/issues/open/iss-122-… — decision appendix on the ledger entry
  • .abcd/development/intents/drafts/itd-93-… — Open Questions → RESOLVED with rationale
  • .abcd/development/intents/planned/itd-28-… — Stage-2 wording amended to the adapter shape + new loud-staging acceptance criterion

Record-only change — no code. record-lint exits 0 after all edits.

A maintainer grill interview settled every pending design decision:
iss-35 resolves (its graduation gate is shipped and armed); iss-122 gets
a pinned input manifest with tiered depth and procedural-only refusal;
itd-93's four open questions resolve (launch sub-verb, self-scaffold
parity, built-in rehearsal mode, changelog-heading seam) and it promotes
standalone/minor with a PRD from the interview; itd-28's Stage-2 gate is
signed off as scanner-seam adapter work (native default, gitleaks
opt-in, loud engine reporting).

Decisions land in DECISIONS.md with rejected alternatives; the new
plans/2026-07-24-next-run-queue.md carries the run queue, STOP
conditions, and sequencing for the next autonomous implementation run.

Assisted-by: Claude:claude-fable-5
@REPPL
REPPL enabled auto-merge July 24, 2026 17:51
@REPPL
REPPL merged commit 31a3092 into main Jul 24, 2026
12 checks passed
@REPPL
REPPL deleted the docs/grill-decisions-next-run-queue branch July 24, 2026 17:53
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant