diff --git a/docs_build/dev/reports/charlie_eod_report.md b/docs_build/dev/reports/charlie_eod_report.md new file mode 100644 index 000000000..c09300c65 --- /dev/null +++ b/docs_build/dev/reports/charlie_eod_report.md @@ -0,0 +1,96 @@ +# Team Charlie EOD Report + +Date: 2026-06-26 +Team: Charlie + +## Summary + +Team Charlie EOD closeout completed as an operational reporting pass. + +No new feature implementation was performed. No runtime behavior, UI behavior, API behavior, database behavior, or unrelated files were changed. + +## PRs Reviewed + +| PR | Title | State | Merge Result | +| --- | --- | --- | --- | +| #219 | PR_26177_CHARLIE_009-sprites-legacy-audit-plan | Open draft, mergeable=false, no reviews | Not merged | +| #220 | PR_26177_CHARLIE_010-sprites-api-db-foundation | Open draft | Not merged | +| #221 | PR_26177_CHARLIE_011-sprites-tool-shell | Open draft | Not merged | +| #222 | PR_26177_CHARLIE_012-sprites-library-crud | Open draft | Not merged | +| #223 | PR_26177_CHARLIE_013-sprites-import-preview-metadata-palette | Open draft | Not merged | +| #224 | PR_26177_CHARLIE_014-sprites-tags-categories-search | Open draft | Not merged | +| #225 | PR_26177_CHARLIE_015-sprites-reference-protection | Open draft | Not merged | +| #226 | PR_26177_CHARLIE_016-sprites-playwright-final-polish | Open draft | Not merged | +| #227 | PR_26177_CHARLIE_017-sprites-toolbox-entry-active | Open draft | Not merged | +| #228 | PR_26177_CHARLIE_018-sprites-testable-mvp-completion | Open draft | Not merged | + +## PRs Merged + +None. + +## Merge Order + +No merges were performed. The dependency-order merge gate stops at PR #219 because it is still draft, mergeable=false, and has no recorded review approval. + +## Required Reports And ZIPs + +| Check | Result | Notes | +| --- | --- | --- | +| PR reports written | PASS | Reports are present for PRs #219-#228. | +| Branch validation reports | PASS | Present for PRs #219-#228. | +| Requirement checklist reports | PASS | Present for PRs #219-#228. | +| Validation lane reports | PASS | Present for PRs #219-#228. | +| Manual validation notes | PASS | Present for PRs #219-#228. | +| Repo ZIP artifacts | PASS | Local ZIP artifacts are present under `tmp/` for PRs #219-#228. | + +## Branch Validation + +PASS + +The repository was returned to `main`, pulled from `origin/main`, and verified clean/synced before this report branch was created. + +## Repository Status + +PASS + +Main branch baseline before the report branch: + +- Branch: `main` +- Worktree: clean +- Local/origin sync: `0 0` +- Main commit: `c2a7b0fdbf16f2a8275c70bf92336a3dc928106f` + +## Validation Summary + +- PASS: EOD project instruction review. +- PASS: GitHub PR state reviewed. +- PASS: PR #219 review status checked; no reviews recorded. +- PASS: Report presence check for PRs #219-#228. +- PASS: ZIP presence check for PRs #219-#228. +- PASS: No runtime files changed by this EOD report. +- PASS: No UI files changed by this EOD report. +- PASS: No API files changed by this EOD report. +- PASS: No database files changed by this EOD report. +- PASS: No `start_of_day` files changed. + +## Manual Validation Summary + +Manual closeout confirmed that Team Charlie should not merge the Sprites stack until PR #219 is ready, mergeable, and approved. Later Sprites PRs remain dependent on the earlier stack order and should not be merged out of order. + +## Outstanding Backlog + +Sprites: + +- Interactive canvas/grid editor +- Width/height controls +- Palette/Colors integration (reference only) +- Pixel painting +- Save/load sprite pixel data +- Preview polish +- Animation support (future) + +## EOD Result + +PASS with blocked merges. + +The repository closeout is operationally clean. Charlie implementation merges remain pending because the first Sprites PR in dependency order is not merge-ready.